HAFSLUND MAGNORA SOL AS

Org.nr: 929283112

Hafslund Magnora Sol is one of Norway's most active utility-scale solar developers, with a 700 MW pipeline of grid-queued projects concentrated in Eastern Norway and Vestfold/Telemark.

Active Queue

Production

700 MW

Consumption

20 MW

Cases

26

Active Concessions

Production

192 MW

Consumption

0 MW

Cases

4

Overview

Hafslund Magnora Sol AS — a joint venture between Hafslund and Magnora — is pursuing an aggressive solar-only strategy across Southern and Eastern Norway, with 26 active grid queue positions totalling nearly 700 MW of production capacity. The company holds 4 active concession cases covering 192 MW, while 4 earlier applications (295 MW) were withdrawn, largely due to grid connection challenges at substations like Minne and Frogner. The sheer volume and geographic spread of queue reservations signals a portfolio development approach, likely with the intent to advance the most viable projects through to construction.

Active Regions

InnlandetAkershusVestfoldTelemarkØstfoldBuskerud

Strategic Focus

Hafslund Magnora Sol is pursuing a pure-play utility-scale solar strategy in Norway's most populous and grid-accessible regions — primarily Eastern Norway (NO1) and Vestfold/Telemark (NO2). The company appears to be reserving large numbers of grid connection slots across multiple substations simultaneously, hedging against grid constraints by maintaining a diversified queue. The single 20 MW consumption entry at Tveiten TRA may indicate co-location of storage or a load facility. Earlier withdrawals at Minne and Frogner highlight that grid capacity remains the key bottleneck for project progression.

Recent Activity

In late June 2026, the company saw two queue positions removed — an 83 MW slot at Minne TRA and a 16 MW slot at Frogner TRA — suggesting ongoing portfolio pruning or grid capacity rejections. Simultaneously, a 25 MW Flesaker TRA position was upgraded from 'in queue' to 'reserved', and its target connection date was pushed back from October 2028 to September 2030, indicating slower-than-expected progress toward construction readiness.

Øvre Eiker
124
Eidsvoll
114
Rendalen
86
Skien
64
Lillestrøm
58
Sarpsborg
51
Hamar
47
Holmestrand
47
Froland
33
Tønsberg
27
110 of 18
1 / 2
86productionRendalen transformatorstasjon TRARendalenElvia AsIn Queuesolar
68productionFlesaker TRAØvre EikerGlitre Nett ASReservedsolar
55productionMinne TRAEidsvollElvia AsIn Queuesolar
47productionVang TRAHamarElvia AsIn Queuesolar
38productionFrogner TRALillestrømElvia AsReservedsolar
35productionHof TRAHolmestrandLede ASReservedsolar
31productionFlesaker TRAØvre EikerGlitre Nett ASIn Queuesolar
30productionMinne TRAEidsvollElvia AsIn Queuesolar
29productionMinne TRAEidsvollElvia AsIn Queuesolar
28productionHasle TRASarpsborgElvia AsIn Queuesolar