Øvre Eiker

Øvre Eiker is emerging as a major grid hub and solar development hotspot, anchored by the transformative new Eiker transformer station.

Active Queue

Production

137 MW

Consumption

361 MW

Cases

7

Active Concessions

Production

33 MW

Consumption

0 MW

Cases

17

Overview

Øvre Eiker is undergoing significant grid transformation centered on the new Eiker transformer station (replacing the aging Flesaker station), which has attracted a wave of solar project applications and large-scale consumption reservations. A 350 MW data center reservation by Fiskumparken C4 AS and 136.6 MW of solar in the grid queue signal strong investor interest in the municipality's evolving transmission capacity. With 17 active concession cases — predominantly grid infrastructure — and 7 active queue items, the municipality represents one of the most strategically significant nodes in the regional grid for Numedal and Buskerud.

Recent Activity

Significant recent concession activity: NVE granted concession for the Eiker transformer station (26.08.2025), followed by an appeal forwarded to the Ministry of Energy (01.10.2025) and a new public hearing stage as of August 2026. The 300(420) kV Eiker–Tegneby/Filtvedt og Brenntangen project received concession after complaint review (03.07.2026). The 300(420) kV Eiker–Hof and Hof–Tveiten project also received final concession approval recently. These developments mark the Eiker node as actively advancing through the regulatory pipeline.

Key Substations

Eiker transformatorstasjon (new, 420 kV — under development)Flesaker transformatorstasjon (existing, being replaced/upgraded)

Municipality Stance

No explicit opposition signals detected; the municipality appears receptive to energy infrastructure development. The Eiker transformer station concession process involved appeals forwarded to the Ministry of Energy, reflecting procedural complexity rather than local resistance. Active solar and large consumption project queuing at Flesaker TRA suggests a permissive local environment.

Outlook

Øvre Eiker has strong growth prospects driven by the completion of the new Eiker transformer station, which will substantially increase available grid capacity at the 420 kV level. This is likely to unlock further solar development — Hafslund Magnora Sol alone has 124 MW queued at Flesaker — and the 350 MW data center reservation by Fiskumparken C4 AS points to significant future consumption growth. Developers should monitor the appeal process for the Eiker station closely, as its resolution will determine when new capacity becomes available. The concentration of solar queue interest at Flesaker TRA suggests competition for connection slots may increase.

Solar Power
137
Grid Infrastructure
Hydropower
Other
Data Centers
DRAMMEN FJERNVARME AS11consumptionFlesaker TRAGlitre Nett ASReservedother
ENERGEIA GUNNHUS AS5productionFlesaker TRAGlitre Nett ASIn Queuesolar
FISKUMPARKEN C4 AS350consumptionFlesaker TRAGlitre Nett ASIn Queuedatacenter
HAFSLUND MAGNORA SOL AS68productionFlesaker TRAGlitre Nett ASReservedsolar
HAFSLUND MAGNORA SOL AS31productionFlesaker TRAGlitre Nett ASIn Queuesolar
HAFSLUND MAGNORA SOL AS25productionFlesaker TRAGlitre Nett ASReservedsolar
HYDROPOWER AS8productionFlesaker TRAGlitre Nett ASReservedsolar