Holmestrand
Holmestrand is emerging as a significant solar and grid hub, anchored by major Statnett transmission upgrades and a busy queue at Hof transformer station.
Active Queue
Production
83 MWConsumption
71 MWCases
12Active Concessions
Production
18 MWConsumption
0 MWCases
6Overview
Holmestrand has strong energy development momentum, with 12 active grid queue positions and 6 concession cases spanning solar, grid infrastructure, battery storage, and industrial consumption. The Hof transformer station is the focal point for new connections, supported by Statnett's ongoing 300/420 kV transmission upgrades linking Eiker, Hof, and Tveiten. Solar development is particularly prominent, with Pyur Energy, Hafslund Magnora Sol, and others competing for grid capacity alongside significant industrial and transport consumers.
Recent Activity
Activity in the last 30 days has been mixed: ASKO OSLOFJORD AS added a 4 MW transport consumption project to the Hof TRA queue, while Geisli Energi AS withdrew an 18 MW solar project and UNCAP AS fully exited the queue with two 5 MW positions (production and consumption). The UNCAP withdrawals total 20 MW removed, suggesting some projects are finding conditions at Hof TRA challenging, though new entrants continue to join.
Key Substations
Municipality Stance
No explicit municipal opposition is evident; the regulatory environment appears supportive, with multiple concessions granted and a high volume of queue activity at Hof TRA. The presence of major Statnett infrastructure investment signals a strategically important location for grid development.
Outlook
Holmestrand has strong near-term prospects driven by the completed Statnett 300/420 kV upgrade corridor through Hof, which should unlock additional grid capacity for the dense queue of solar and consumption projects. The Hof TRA substation is well-positioned to become a key regional connection point. Solar developers should monitor queue competition closely, as multiple players are targeting the same node. Industrial demand from Norgips (39 MW) and transport electrification (Kopstad Godsterminal, ASKO) point to a growing consumption base that could complement renewable production in the area.
| ASKO OSLOFJORD AS | 3.6 | consumption | Hof TRA | Lede AS | In Queue | transport |
| GÅRDSKRAFT AS | 6 | production | Hof TRA | Lede AS | Reserved | hydro |
| HAFSLUND MAGNORA SOL AS | 35 | production | Hof TRA | Lede AS | Reserved | solar |
| HAFSLUND MAGNORA SOL AS | 12 | production | Hof TRA | Lede AS | Reserved | solar |
| KOPSTAD GODSTERMINAL AS | 8.8 | consumption | Hof TRA | Lede AS | Reserved | transport |
| NORGIPS NORGE AS | 32 | consumption | Hof TRA | Lede AS | In Queue | industrial |
| NORGIPS NORGE AS | 7 | consumption | Hof TRA | Lede AS | In Queue | industrial |
| PYUR ENERGY AS | 10 | production | Hof TRA | Lede AS | Reserved | solar |
| PYUR ENERGY AS | 10 | consumption | Hof TRA | Lede AS | In Queue | battery |
| PYUR ENERGY AS | 10 | production | Hof TRA | Lede AS | In Queue | solar |