Holmestrand

Holmestrand is emerging as a significant solar and grid hub, anchored by major Statnett transmission upgrades and a busy queue at Hof transformer station.

Active Queue

Production

83 MW

Consumption

71 MW

Cases

12

Active Concessions

Production

18 MW

Consumption

0 MW

Cases

6

Overview

Holmestrand has strong energy development momentum, with 12 active grid queue positions and 6 concession cases spanning solar, grid infrastructure, battery storage, and industrial consumption. The Hof transformer station is the focal point for new connections, supported by Statnett's ongoing 300/420 kV transmission upgrades linking Eiker, Hof, and Tveiten. Solar development is particularly prominent, with Pyur Energy, Hafslund Magnora Sol, and others competing for grid capacity alongside significant industrial and transport consumers.

Recent Activity

Activity in the last 30 days has been mixed: ASKO OSLOFJORD AS added a 4 MW transport consumption project to the Hof TRA queue, while Geisli Energi AS withdrew an 18 MW solar project and UNCAP AS fully exited the queue with two 5 MW positions (production and consumption). The UNCAP withdrawals total 20 MW removed, suggesting some projects are finding conditions at Hof TRA challenging, though new entrants continue to join.

Key Substations

Hof transformatorstasjon (Hof TRA)Sande transformatorstasjonTveiten transformatorstasjonFlesaker transformatorstasjon

Municipality Stance

No explicit municipal opposition is evident; the regulatory environment appears supportive, with multiple concessions granted and a high volume of queue activity at Hof TRA. The presence of major Statnett infrastructure investment signals a strategically important location for grid development.

Outlook

Holmestrand has strong near-term prospects driven by the completed Statnett 300/420 kV upgrade corridor through Hof, which should unlock additional grid capacity for the dense queue of solar and consumption projects. The Hof TRA substation is well-positioned to become a key regional connection point. Solar developers should monitor queue competition closely, as multiple players are targeting the same node. Industrial demand from Norgips (39 MW) and transport electrification (Kopstad Godsterminal, ASKO) point to a growing consumption base that could complement renewable production in the area.

Solar Power
67
Battery Storage (BESS)
10
Hydropower
6
Grid Infrastructure
Transport & EV Charging
Industrial
ASKO OSLOFJORD AS3.6consumptionHof TRALede ASIn Queuetransport
GÅRDSKRAFT AS6productionHof TRALede ASReservedhydro
HAFSLUND MAGNORA SOL AS35productionHof TRALede ASReservedsolar
HAFSLUND MAGNORA SOL AS12productionHof TRALede ASReservedsolar
KOPSTAD GODSTERMINAL AS8.8consumptionHof TRALede ASReservedtransport
NORGIPS NORGE AS32consumptionHof TRALede ASIn Queueindustrial
NORGIPS NORGE AS7consumptionHof TRALede ASIn Queueindustrial
PYUR ENERGY AS10productionHof TRALede ASReservedsolar
PYUR ENERGY AS10consumptionHof TRALede ASIn Queuebattery
PYUR ENERGY AS10productionHof TRALede ASIn Queuesolar
110 of 12