EQUINOR ASA
Org.nr: 923609016
Equinor is pursuing broad offshore electrification across Norway, targeting platform power-from-shore to cut emissions at its key petroleum fields.
Active Queue
Production
0 MWConsumption
250 MWCases
4Active Concessions
Production
0 MWConsumption
275 MWCases
8Overview
Equinor's energy infrastructure activity is dominated by power-from-shore (kraft frå land) projects, seeking to electrify major offshore petroleum installations including Oseberg, Hammerfest LNG, and the Halten-area platforms in order to reduce CO2 emissions. The company holds grid reservations and concession applications spanning Vestland, Finnmark, and Trøndelag, reflecting a national decarbonization strategy for its upstream assets. A notable recent development is the withdrawal of a 350 MW queue reservation at Hyggevatn, suggesting the Wisting field electrification project may have been deprioritized or restructured.
Active Regions
Strategic Focus
Equinor's activity centers on decarbonizing its existing petroleum infrastructure through power-from-shore electrification, replacing offshore gas turbines with land-based electricity across multiple fields. Secondary priorities include the Northern Lights CCS expansion and an emerging hydrogen/industrial interest near Bergen (Alver/Lindås). The company's grid and concession portfolio is almost entirely consumption-side, with no renewable generation projects visible in this dataset.
Recent Activity
In the past 30 days, Equinor made two significant moves: it withdrew its 350 MW grid queue reservation at Hyggevatn transformer station (NO4), effectively shelving or restructuring the large-scale Wisting field electrification project, and simultaneously added a new 40 MW consumption project to the queue at Lindås transformer station (NO5), likely related to its industrial or hydrogen activities near Bergen.
| Øygarden | — |
| Hammerfest - Hámmerfeasta | — |
| Alver | — |
| Bremanger | — |
| Overhalla | — |
| Flatanger | — |
| Åfjord | — |
| Nærøysund | — |
| Sør-Varanger | — |
| Tysvær | — |
| 180 | consumption | Ålfoten TRA | Bremanger | Linja AS | withdrawn | petroleum |
| 171 | consumption | Namsos TRA | Overhalla | Tensio AS | withdrawn | petroleum |
| 105 | consumption | Kollsnes KRA/TRA | Øygarden | Equinor Asa | Reserved | petroleum |
| 80 | consumption | Hyggevatn TRA | Sør-Varanger | Equinor Asa | withdrawn | petroleum |
| 75 | consumption | Lindås transformatorstasjon TRA | Alver | BKK AS | Reserved | hydrogen |
| 50 | consumption | Lindås transformatorstasjon TRA | Alver | BKK AS | withdrawn | hydrogen |
| 40 | consumption | Lindås transformatorstasjon TRA | Alver | BKK AS | In Queue | petroleum |
| 30 | consumption | Skaidi TRA | Hammerfest - Hámmerfeasta | Lucerna AS | In Queue | petroleum |