Øygarden
Øygarden serves as a major energy infrastructure hub with significant offshore wind potential, petroleum electrification projects, and critical grid reinforcement for the Bergen region.
Active Queue
Production
40 MWConsumption
283 MWCases
7Active Concessions
Production
250 MWConsumption
146 MWCases
19Overview
The municipality is experiencing high energy development activity with 19 active concession cases and multiple grid queue reservations totaling over 640 MW. Major initiatives include offshore wind demonstration projects, petroleum sector electrification, and substantial grid infrastructure upgrades to support the Bergen area's growing energy demands.
Recent Activity
Limited recent activity with one small 1 MW project entering and immediately withdrawing from the grid queue at Litle Sotra station, indicating ongoing project evaluation processes.
Key Substations
Outlook
Strong outlook driven by offshore wind demonstration projects, continued petroleum sector electrification demands, and strategic position as a grid infrastructure hub serving the Bergen region's energy transition needs.
| CARBON REMOVAL AS | 74 | consumption | Kollsnes KRA/TRA | BKK AS | Reserved | industrial |
| CLIMEWORKS NORWAY AS | 50 | consumption | Kollsnes KRA/TRA | BKK AS | withdrawn | hydrogen |
| EQUINOR ASA | 105 | consumption | Kollsnes KRA/TRA | Equinor Asa | Reserved | petroleum |
| FLEXFUELS AS | 25 | consumption | Kollsnes KRA/TRA | BKK AS | Reserved | industrial |
| H2 PRODUCTION AS | 9 | consumption | Kollsnes KRA/TRA | BKK AS | Reserved | hydrogen |
| Northern Lights Trinn 2 | 20 | consumption | Kollsnes KRA/TRA | BKK AS | Reserved | industrial |
| TRESMARKA AS | 30 | consumption | Litle Sotra TRA | BKK AS | Reserved | transport |
| TRESMARKA AS | 20 | consumption | Litle Sotra TRA | BKK AS | withdrawn | transport |
| TRESMARKA AS | 20 | consumption | Litle Sotra TRA | BKK AS | In Queue | transport |
| WIND CATCHING DEMO AS | 40 | production | Kollsnes KRA/TRA | BKK AS | In Queue | offshore_wind |