Nærøysund is an established wind energy hub with significant grid expansion underway and emerging large-scale projects including a novel gas-with-CCS power plant.
Active Queue
Production
0 MWConsumption
0 MWCases
0Active Concessions
Production
711 MWConsumption
38 MWCases
17Overview
Nærøysund hosts a mature wind energy portfolio anchored by the operational Hundhammerfjellet and Ytre Vikna facilities, with major repowering and expansion projects in progress totalling over 300 MW of wind capacity. Tensio TN is upgrading the regional grid infrastructure with a new 170 kV submarine cable across Folda and a voltage upgrade from 66 kV to 132 kV toward Namsos, signalling significant capacity investment. A notable wildcard is Ocean-Power's 220 MW floating gas power plant with CCS at Kråkøya, currently in the hearing phase, which could substantially reshape the municipality's energy profile.
Recent Activity
Sinkaberg NT145 AS was granted a concession on 7 August 2026 for electrical installations at its factory in Nærøysund, reflecting continued industrial energy development in the municipality.
Key Substations
Municipality Stance
Nærøysund appears receptive to energy development, with a long track record of hosting wind farms and grid infrastructure. Industrial concessions have been granted and appealed successfully, and a broad range of project types — from wind repowering to novel CCS gas power — are actively progressing, suggesting a permissive local environment.
Outlook
Nærøysund has strong prospects for continued energy investment. The grid upgrades by Tensio TN (Folda cable and 132 kV line to Namsos) will unlock additional transmission capacity critical for new projects. NTE Energi's Ytre Vikna 2.0 (up to 150 MW) and ANEO's Hundhammerfjellet repowering (56 MW) represent near-term wind pipeline, while the Ocean-Power CCS gas project introduces an unconventional but high-capacity option. Electrification demand from Equinor's Haltenbanken offshore platforms adds further long-term load potential. No Statnett grid queue activity is currently registered, which may reflect that developers are awaiting the grid upgrades before committing to queue positions.