Stjørdal

Stjørdal's Eidum substation is emerging as a key grid hub, attracting a large datacenter reservation and renewable hydrogen project alongside wind power aspirations.

Active Queue

Production

24 MW

Consumption

189 MW

Cases

3

Active Concessions

Production

0 MW

Consumption

0 MW

Cases

7

Overview

Stjørdal hosts a cluster of activity anchored around Eidum transformatorstasjon, which serves as the connection point for several significant queue reservations including a 180 MW datacenter (Verne Norway) and a hydrogen facility (Meråker Hydrogen). The previously rejected Kopperaa wind project spanning Meråker and Stjørdal remains open for revision, representing a potential 90 MW attributed to this municipality. Active concession cases are primarily grid and transport infrastructure, with no active production or consumption MW yet secured through concessions.

Recent Activity

Tesla was granted a concession for a Supercharger fast-charging station in Stjørdal on 30 July 2026, adding to the municipality's EV infrastructure. This is the only notable regulatory development in the past 30 days.

Key Substations

Eidum transformatorstasjonSutterø transformatorstasjon

Municipality Stance

No clear signals of opposition or strong promotion; the municipality appears to accommodate infrastructure and industrial development, with grid and EV charging concessions proceeding smoothly. The Kopperaa wind project's prior rejection was driven by national-level Sami and reindeer herding concerns, not local municipal resistance.

Outlook

Eidum substation is shaping up as a strategic connection point in the region, with 189 MW of consumption capacity queued including a major datacenter and a hydrogen project. Statnett's recent investment in the substation supports further capacity growth. The Kopperaa wind project revival could add significant production capacity if revised conditions overcome previous Sami interest objections. Developers should monitor Eidum grid capacity closely given the large datacenter reservation already in queue.

Hydropower
24
Transport & EV Charging
Grid Infrastructure
Wind Power
Data Centers
Hydrogen & Ammonia
CLEMENS KRAFT AS24productionEidum TRATensio ASIn Queuehydro
Meråker Hydrogen As9.2consumptionEidum TRATensio ASReservedhydrogen
VERNE NORWAY AS180consumptionEidum TRATensio ASIn Queuedatacenter