Stjørdal
Stjørdal's Eidum substation is emerging as a key grid hub, attracting a large datacenter reservation and renewable hydrogen project alongside wind power aspirations.
Active Queue
Production
24 MWConsumption
189 MWCases
3Active Concessions
Production
0 MWConsumption
0 MWCases
7Overview
Stjørdal hosts a cluster of activity anchored around Eidum transformatorstasjon, which serves as the connection point for several significant queue reservations including a 180 MW datacenter (Verne Norway) and a hydrogen facility (Meråker Hydrogen). The previously rejected Kopperaa wind project spanning Meråker and Stjørdal remains open for revision, representing a potential 90 MW attributed to this municipality. Active concession cases are primarily grid and transport infrastructure, with no active production or consumption MW yet secured through concessions.
Recent Activity
Tesla was granted a concession for a Supercharger fast-charging station in Stjørdal on 30 July 2026, adding to the municipality's EV infrastructure. This is the only notable regulatory development in the past 30 days.
Key Substations
Municipality Stance
No clear signals of opposition or strong promotion; the municipality appears to accommodate infrastructure and industrial development, with grid and EV charging concessions proceeding smoothly. The Kopperaa wind project's prior rejection was driven by national-level Sami and reindeer herding concerns, not local municipal resistance.
Outlook
Eidum substation is shaping up as a strategic connection point in the region, with 189 MW of consumption capacity queued including a major datacenter and a hydrogen project. Statnett's recent investment in the substation supports further capacity growth. The Kopperaa wind project revival could add significant production capacity if revised conditions overcome previous Sami interest objections. Developers should monitor Eidum grid capacity closely given the large datacenter reservation already in queue.
| CLEMENS KRAFT AS | 24 | production | Eidum TRA | Tensio AS | In Queue | hydro |
| Meråker Hydrogen As | 9.2 | consumption | Eidum TRA | Tensio AS | Reserved | hydrogen |
| VERNE NORWAY AS | 180 | consumption | Eidum TRA | Tensio AS | In Queue | datacenter |