Aurland

Aurland is a major hydropower hub in Western Norway with significant grid infrastructure and nearly 900 MW of production capacity in the queue.

Active Queue

Production

877 MW

Consumption

141 MW

Cases

7

Active Concessions

Production

0 MW

Consumption

0 MW

Cases

6

Overview

Aurland hosts some of Norway's most strategically important transmission infrastructure, including the Aurland 1, 2, and 3 transformer stations that serve as backbone connection points for large-scale hydropower. Hafslund is the dominant player with over 860 MW of queue reservations across multiple connection points, while Statnett is actively upgrading the 420 kV transmission corridor linking Aurland to Sogndal and Hol. Recent activity suggests Hafslund may be pivoting from production to consumption at Aurland 3, potentially indicating interest in power-intensive industrial or pumped-storage use.

Recent Activity

In late June 2026, Hafslund Kraft withdrew a 125 MW production reservation at Aurland 3 and simultaneously entered the queue for 125 MW of consumption capacity at the same connection point — a notable strategic shift that may indicate interest in pumped-storage hydropower or a power-intensive industrial project.

Key Substations

Aurland 1 KRA/TRAAurland 2 KRA/TRAAurland 3 KRA/TRAVangen transformatorstasjonSogndal transformatorstasjon

Municipality Stance

Aurland appears supportive of energy development, having granted permits for shore power at Flåm and expansion of Vangen transformer station. The municipality plays a passive but enabling role as a host for national-level transmission infrastructure managed by Statnett.

Outlook

Aurland has strong fundamentals for continued energy development given its role as a central node in the Western Norway transmission grid. The 420 kV Aurland–Sogndal upgrade will enhance export capacity and attract further project interest. Hafslund's large queue reservations signal ongoing investment in the region's hydropower assets. The shift toward consumption capacity at Aurland 3 is worth monitoring as it may open opportunities for co-located industrial or flexibility projects.

Hydropower
877
Grid Infrastructure
Transport & EV Charging
Aurland Hamnevesen16consumptionAurland 2 KRA/TRASygnir ASReservedtransport
CLEMENS KRAFTVERK AS5productionAurland 2 KRA/TRAHafslund Kraft AsReservedhydro
FORTE AS7.2productionAurland 2 KRA/TRAHafslund Kraft AsReservedhydro
HAFSLUND AS620productionAurland 1 KRA/TRAHafslund Kraft AsReservedhydro
HAFSLUND KRAFT AS140productionAurland 3 KRA/TRAHafslund Kraft AsIn Queuehydro
HAFSLUND KRAFT AS125consumptionAurland 3 KRA/TRAHafslund Kraft AsIn Queuehydro
HAFSLUND KRAFT AS105productionAurland 2 KRA/TRAHafslund Kraft AsIn Queuehydro