Vaksdal

Vaksdal serves as a critical grid infrastructure hub with major 420 kV transmission projects and growing renewable energy development at the Dale industrial area.

Active Queue

Production

22 MW

Consumption

29 MW

Cases

4

Active Concessions

Production

0 MW

Consumption

0 MW

Cases

10

Overview

The municipality is experiencing significant grid modernization through multiple Statnett 420 kV transmission projects, including the major Samnanger-Øygarden connection and new Dalekvam transformer station. Recent activity shows renewed energy interest at the historic Dale industrial site, with 22 MW of new production capacity entering the grid queue in the past month.

Recent Activity

Strong surge in renewable energy development with 22 MW of new production capacity entering the grid queue in the past month, including projects by SMÅKRAFT AS (15 MW) and NJORD ENERGI HOLDING AS (7 MW), both targeting the Dale area for development.

Key Substations

Dalekvam transformatorstasjonKrossdalen transformatorstasjonDaleRavneberget transformatorstasjon

Outlook

Excellent prospects for energy development given the municipality's role as a major grid hub with multiple 420 kV transmission upgrades underway. The Dale industrial area shows particular promise with existing grid capacity reservations and strong developer interest in both renewable production and industrial consumption projects.

Hydropower
15
Oil & Gas
7
Grid Infrastructure
Industrial
Transport & EV Charging
Dale Fabrikker20consumptionDaleBKK ASReservedindustrial
NJORD ENERGI HOLDING AS7productionDaleBKK ASIn Queuepetroleum
SMÅKRAFT AS15productionDaleBKK ASIn Queuehydro
STATENS VEGVESEN9consumptionDaleBKK ASReservedtransport