Voss

Voss is a well-established hydropower municipality with significant Statnett transmission infrastructure and steady small hydro development activity.

Active Queue

Production

5.3 MW

Consumption

0 MW

Cases

1

Active Concessions

Production

15 MW

Consumption

0.0 MW

Cases

18

Overview

Voss hosts a mature energy landscape dominated by small-to-medium hydropower plants and major high-voltage transmission infrastructure, including key Statnett substations at Evanger and multi-municipality 420 kV lines. Active concession cases are almost entirely split between grid infrastructure permits and hydropower facilities, with no wind, solar, or large consumption projects present. Development activity is incremental rather than transformative, with recent filings focused on grid connection amendments for existing hydro assets.

Recent Activity

In early August 2026, Mugåselva Kraft AS filed for an amended grid connection permit for the Mugåselvi hydropower plant in Voss, signalling ongoing incremental development at existing hydro assets. Separately, Statnett's monopole line application between Refsdal and Modalen returned to the formal application stage in August 2026 after reaching public hearing in June 2026, indicating active progression of regional transmission reinforcement.

Key Substations

Evanger transformatorstasjonDalekvam transformatorstasjonGranvin transformatorstasjonBu transformatorstasjonKrossdalen transformatorstasjon

Municipality Stance

No explicit municipal opposition is evident from the data; the steady flow of granted and amended concessions suggests a permissive local environment for hydropower and grid infrastructure, though the municipality has not attracted any new-technology projects such as wind or solar.

Outlook

Voss's outlook is stable but not high-growth. The municipality's primary value for developers lies in its established hydropower base and the presence of major Statnett transmission nodes at Evanger, which provides connectivity for the wider Western Norway grid. The ongoing Refsdal–Modalen monopole project and the Granvin–Bu 132 kV upgrade will improve regional grid capacity. New greenfield opportunities are likely to be limited to small hydro upgrades or run-of-river expansions; the absence of wind, solar, or industrial consumption projects suggests limited near-term diversification unless grid upgrades unlock new capacity at Evanger.

Hydropower
5.3
Grid Infrastructure
SMÅKRAFT AS5.3productionEvanger KRA/TRAIndre Hordaland Kraftnett ASReservedhydro