Ullensvang

Ullensvang is an established hydropower hub with significant grid infrastructure investment and a major 292 MW pumped storage or large-scale hydro project queued at Røldal.

Active Queue

Production

300 MW

Consumption

292 MW

Cases

3

Active Concessions

Production

24 MW

Consumption

0 MW

Cases

22

Overview

Ullensvang hosts a dense portfolio of hydropower concessions and substantial Statnett-led grid upgrades, including the 420 kV Blåfalli–Mauranger–Samnanger transmission corridor. The Statnett grid queue is dominated by Lyse Kraft DA's 292 MW production and matching 292 MW consumption reservation at Røldal KRA/TRA, suggesting a large pumped-storage or flexible generation project in planning. Smaller-scale run-of-river projects continue to come forward alongside key grid reinforcement works.

Recent Activity

No cases are flagged as changed within the last 30 days based on available data. The overall pipeline remains active, with Lyse Kraft DA holding two large queue reservations at Røldal and Statnett's 420 kV upgrade corridor progressing through the concession process.

Key Substations

Mauranger transformatorstasjonSamnanger transformatorstasjonBlåfalli transformatorstasjonRøldal KRA/TRAGranvin transformatorstasjonBu transformatorstasjonFagnes nettstasjonHardanger Energi nettstasjon ved Øvre Krossdalen

Municipality Stance

Ullensvang appears receptive to energy development, with a long tradition of hydropower and active support for grid infrastructure upgrades. Multiple concessions have been granted for both generation and grid projects, and no significant regulatory opposition is evident from the case record.

Outlook

Ullensvang's outlook is strong. The Røldal area is emerging as a focal point for large-scale flexible generation or pumped storage (Lyse Kraft DA's 292 MW paired reservation), which would significantly increase the municipality's strategic importance in the Norwegian power system. Ongoing 420 kV grid upgrades will improve transmission capacity between northern and southern Vestlandet, making Ullensvang more attractive for future energy-intensive industry and additional renewable development. Smaller run-of-river hydro opportunities remain available for developers targeting local grid connection points.

Hydropower
300
Grid Infrastructure
Other
Industrial
Transport & EV Charging
CAPTIVA ENERGI AS7.9productionRøldal KRA/TRAFagne ASIn Queuehydro
LYSE KRAFT AS292productionRøldal KRA/TRALyse Kraft DAIn Queuehydro
LYSE KRAFT AS292consumptionRøldal KRA/TRALyse Kraft DAIn Queueother