Ullensvang is experiencing robust energy development with major hydropower expansion and significant grid infrastructure upgrades led by Lyse Kraft and Statnett.
Active Queue
Production
300 MWConsumption
293 MWCases
4Active Concessions
Production
24 MWConsumption
0 MWCases
22Overview
The municipality shows strong energy sector activity with 22 active concession cases and substantial hydropower development, including Lyse Kraft's major 292 MW Røldal expansion. Significant grid modernization is underway with Statnett upgrading transmission lines to 420 kV and multiple smaller hydropower projects adding to the renewable energy portfolio.
Recent Activity
March 2026 saw concession approvals for temporary power infrastructure supporting the major Røldalstunnel construction project, with ONECO ELEKTRO securing permits for drilling operation power supply at both Seljestad and Liamyrane locations.
Key Substations
Outlook
Strong development prospects with major hydropower capacity expansion and critical transmission infrastructure upgrades positioning Ullensvang as a key energy hub in Vestland, though the high consumption MW in queue suggests significant industrial energy demand growth.
| CAPTIVA ENERGI AS | 7.9 | production | Røldal | Fagne AS | In Queue | hydro |
| LYSE KRAFT AS | 292 | production | Røldal | Lyse Kraft DA | In Queue | hydro |
| LYSE KRAFT AS | 292 | consumption | Røldal | Lyse Kraft DA | In Queue | other |
| TUFTEELVA KRAFT AS | 1.2 | consumption | Røldal | Fagne AS | In Queue | other |