Hol
Hol is an established grid hub with significant transmission infrastructure and a newly queued 94 MW hydro production project.
Active Queue
Production
94 MWConsumption
0 MWCases
1Active Concessions
Production
0 MWConsumption
0 MWCases
6Overview
Hol hosts key nodes in Norway's transmission grid, including the Hol 1 transformer station on the 420 kV Aurland–Hol corridor, and has seen several concession transfers reflecting consolidation among grid operators. A 94 MW production project by Hafslund Kraft AS has just entered the queue at Hol 1, signaling renewed interest in generation capacity in the area. The municipality's energy activity is primarily grid-infrastructure oriented, with the new queue entry representing the most notable development opportunity for the near term.
Recent Activity
In early July 2025, Hafslund Kraft AS entered the grid connection queue at Hol 1 KRA/TRA with a 94 MW production project (classified as 'other' industry category, attributed here as hydro), representing the first new generation capacity reservation in the municipality in the available dataset.
Key Substations
Municipality Stance
No explicit municipal stance data is available, but the presence of major Statnett transmission infrastructure and multiple concession transfers suggests an established and permissive environment for grid and energy development.
Outlook
Hol's role as a transmission hub on the strategically important 420 kV Aurland–Hol corridor positions it well for future energy development. The temperature upgrade of the Aurland–Hol line will increase transmission capacity, potentially opening the door for additional generation projects. Hafslund Kraft's 94 MW queue entry is a positive signal, and developers should monitor grid capacity at Hol 1 as the line upgrade progresses. The municipality's existing hydro infrastructure (Hol III, Hemsil, Godfarfoss) provides a solid foundation for expansion or repowering opportunities.
| HAFSLUND KRAFT AS | 94 | production | Hol 1 KRA/TRA | Føie | In Queue | hydro |