Vefsn
Vefsn is emerging as a major industrial energy hub with significant hydrogen and aluminum production plans, anchored by existing wind power and strong grid infrastructure at Marka substation.
Active Queue
Production
9.2 MWConsumption
849 MWCases
6Active Concessions
Production
401 MWConsumption
0 MWCases
8Overview
The municipality shows robust energy development with 8 active concessions including the operational 400 MW Øyfjellet wind farm and multiple grid infrastructure projects. Grid queue data reveals ambitious industrial expansion plans, particularly hydrogen production with nearly 700 MW of consumption capacity planned, alongside aluminum smelting operations and datacenter development.
Recent Activity
Tesla received concession approval for a Supercharger station in Mosjøen in May 2026, adding to the growing electric vehicle charging infrastructure in the area
Key Substations
Municipality Stance
Supportive of large-scale energy development, evidenced by approved major wind projects and extensive grid infrastructure investments to accommodate industrial expansion
Outlook
Excellent prospects for industrial energy development with Marka substation serving as a major connection hub for hydrogen production, aluminum smelting, and emerging datacenter operations, supported by existing renewable generation capacity
| Alcoa Mosjøen | 41 | consumption | Marka | Linea AS | Reserved | industrial |
| EXANEXT AS | 23 | consumption | Marka | Linea AS | Reserved | datacenter |
| GEN2 ENERGY AS | 500 | consumption | Marka | Linea AS | In Queue | hydrogen |
| GEN2 ENERGY AS | 195 | consumption | Marka | Linea AS | Reserved | hydrogen |
| MIP MILJØKRAFT AS | 9.2 | production | Marka | Linea AS | Reserved | hydro |
| NORSK E-FUEL AS | 90 | consumption | Marka | Linea AS | Reserved | hydrogen |