Vefsn

Vefsn is experiencing significant energy development with major wind projects operational and a strong pipeline of hydrogen and industrial projects seeking grid capacity.

Active Queue

Production

9.2 MW

Consumption

849 MW

Cases

6

Active Concessions

Production

401 MW

Consumption

0 MW

Cases

7

Overview

The municipality hosts the operational 400 MW Øyfjellet wind farm and has substantial future energy demand with 849 MW in consumption projects queued at Marka substation. A diverse energy portfolio is emerging with hydrogen production facilities, industrial expansion, and renewable energy projects driving development.

Recent Activity

The 400 MW Øyfjellet wind farm became operational in September 2022, marking a major milestone. Multiple hydrogen and industrial projects have secured or are seeking grid capacity at Marka substation, indicating strong momentum in energy-intensive industries.

Key Substations

Marka transformatorstasjonMosjøen transformatorstasjon

Outlook

Excellent prospects with Marka substation emerging as a major connection point for large-scale energy projects. The combination of operational wind capacity and substantial hydrogen production pipeline positions Vefsn as a key player in Norway's green energy transition, though grid capacity expansion may be needed to accommodate all planned developments.

Hydropower
9.2
Hydrogen & Ammonia
Grid Infrastructure
Industrial
Wind Power
Transport & EV Charging
Data Centers
Alcoa Mosjøen41consumptionMarkaLinea ASReservedindustrial
EXANEXT AS23consumptionMarkaLinea ASReserveddatacenter
GEN2 ENERGY AS500consumptionMarkaLinea ASIn Queuehydrogen
GEN2 ENERGY AS195consumptionMarkaLinea ASReservedhydrogen
MIP MILJØKRAFT AS9.2productionMarkaLinea ASReservedhydro
NORSK E-FUEL AS90consumptionMarkaLinea ASReservedhydrogen