Narvik

Narvik is emerging as a major data center and industrial hub in Northern Norway, with massive grid capacity reservations driven by hyperscale computing and hydrogen ambitions.

Active Queue

Production

19 MW

Consumption

785 MW

Cases

10

Active Concessions

Production

73 MW

Consumption

144 MW

Cases

24

Overview

Narvik is seeing exceptional energy demand growth, anchored by large-scale data center developments in Bjerkvik and the Skoglund industrial area, alongside a 100 MW hydrogen plant in the queue. The Kvandal and Skoglund transformer stations are the critical nodes enabling this expansion, with Nordkraft Industrinett and Statnett both investing heavily in 132–420 kV infrastructure upgrades. A withdrawn 250 MW hydrogen/ammonia reservation (Narvik Green Ammonia) signals that not all large ambitions have materialized, but active queue demand exceeds 780 MW in consumption.

Recent Activity

In late June–early July 2026, Aker Nscale (AKER NSCALE DC DA) received a concession for electrical installations connected to their data center in Bjerkvik, Narvik, representing a re-issuance of their construction permit. A second related case was confirmed in the application stage on 3 July 2026 with no new material developments.

Key Substations

Kvandal transformatorstasjonSkoglund transformatorstasjon (132 kV and 420 kV)Bjørkåsen transformatorstasjonStormyra transformatorstasjonNarvik transformatorstasjonHergot transformatorstasjonSildvik kraftforsyningsanlegg (KRA)Skjomen kraftforsyningsanlegg (KRA)

Municipality Stance

Narvik appears highly receptive to large-scale energy and industrial development, with active concessions granted for data centers, hydrogen infrastructure, shore power, and significant grid upgrades — suggesting a pro-development local environment.

Outlook

Narvik has strong forward momentum as a data center destination, leveraging access to renewable hydropower and strategic grid infrastructure at Kvandal and Skoglund. The 420 kV Skoglund station upgrade and multiple Nordkraft Industrinett grid investments signal long-term industrial capacity planning. The hydrogen segment carries promise but also risk, as evidenced by Narvik Green Ammonia's 250 MW withdrawal. Developers targeting data center or large industrial loads should prioritize early queue positions at Kvandal TRA, as demand pressure is already intense.

Hydropower
19
Grid Infrastructure
Data Centers
Transport & EV Charging
Hydrogen & Ammonia
Aquaculture
Industrial
Wind Power
Other
AKER NSCALE AS140consumptionBallangenNordkraft IndustrinettIn Queuedatacenter
Foldvik Kraftverk7.8productionKvandal TRANoranett ASReservedhydro
FRANZEFOSS MINERALS AS4.3consumptionSkjomen KRANoranett ASIn Queueindustrial
Narvik Green Ammonia250consumptionKvandal TRANordkraft Industrinettwithdrawnhydrogen
NARVIK HYDROGEN AS100consumptionSildvik KRANarvik Hydrogen ASIn Queuehydrogen
NARVIKFJELLET ALLMENN AS8.5consumptionNarvik TRANoranett ASReservedother
PLUG NORD AS12consumptionNarvik TRANoranett ASReservedtransport
STATKRAFT ENERGI AS11productionSkjomen KRAStatkraft Energi AsReservedhydro
Aaktik Digital As230consumptionKvandal TRANordkraft IndustrinettReserveddatacenter
Aaktik Digital200consumptionKvandal TRANordkraft IndustrinettIn Queuedatacenter