Sunndal

Sunndal serves as a regional industrial power hub with key transmission infrastructure supporting aluminum production and hydropower operations.

Active Queue

Production

626 MW

Consumption

211 MW

Cases

8

Active Concessions

Production

0 MW

Consumption

0 MW

Cases

11

Overview

The municipality hosts critical 132 kV transmission infrastructure connecting to Hydro Aluminium's metallurgical operations, with Statnett maintaining key substations at Aura and Viklandet. While hydropower development shows mixed signals with one withdrawn application, the area maintains active grid infrastructure upgrades to support industrial consumption.

Recent Activity

Hydro Aluminium took over critical 132 kV transmission lines to support metallurgical operations, while Statnett upgraded aging infrastructure at Viklandet station. One small hydropower project was withdrawn in late 2024.

Key Substations

Aura transformatorstasjonViklandet transformatorstasjonSunndalsøra 5

Outlook

Strong industrial power demand from aluminum production provides stable foundation, though limited new generation development suggests focus remains on maintaining existing infrastructure rather than expansion.

End CustomerMWProd/ConsStationStatusType
Averøy Industripark AS20consumptionViklandetIn Queuepetroleum
BIO340consumptionViklandetIn Queueindustrial
Green H AS50consumptionViklandetIn Queuehydrogen
Grønnkraft AS5.5productionAuraReservedhydro
Havvindaktører620productionAuraReservedoffshore_wind
Hydro Aluminium AS85consumptionAuraIn Queueindustrial
Hydro Aluminium AS7.5consumptionAuraReservedindustrial
Pega Nordic AS8consumptionAuraIn Queuedatacenter