Strand
Strand municipality shows steady grid infrastructure activity with no renewable generation projects currently in development.
Active Queue
Production
0 MWConsumption
0 MWCases
0Active Concessions
Production
0 MWConsumption
1.6 MWCases
8Overview
Strand's energy landscape is dominated by grid infrastructure work, with LNETT AS driving multiple concession cases covering transformer stations, switching stations, and high-voltage lines. The municipality hosts legacy industrial grid connections, notably the 66 kV line serving Stavanger Steel, alongside a small quarry expansion at Tau. A significant 800 MNOK, 132 kV grid upgrade project connecting Strand-Finnøy-Nordbø has been withdrawn, suggesting some uncertainty around major capacity expansion in the area.
Recent Activity
No changes recorded in the last 30 days based on available data.
Key Substations
Municipality Stance
Strand does not appear to be actively pursuing new energy generation projects. The focus is on maintaining and upgrading existing grid infrastructure, with no evident push for renewable development. The withdrawal of the major 132 kV Strand-Finnøy-Nordbø upgrade may reflect cost or regulatory challenges rather than municipal opposition.
Outlook
Strand's near-term energy outlook is centered on grid maintenance and modest industrial connections rather than new generation capacity. The absence of Statnett queue reservations and the withdrawal of the large 132 kV regional upgrade project limits the municipality's appeal for large-scale renewable developers in the short term. However, existing substations at Tau and Fjelde, along with the Helmikstøl station shared with Sandnes, provide connection points that could support future projects if grid capacity is expanded. Developers should monitor LNETT AS plans for regional grid reinforcement before committing to generation projects in this area.