Luster
Luster is a high-activity energy municipality dominated by Hydro's large-scale pumped storage development and significant industrial and datacenter grid queue demand.
Active Queue
Production
207 MWConsumption
430 MWCases
17Active Concessions
Production
208 MWConsumption
0 MWCases
19Overview
Luster hosts a concentrated cluster of energy activity centered on Hydro Energi's major pumped storage investments at Illvatn and Øyane, supported by extensive new 132 kV and 420 kV grid infrastructure at Jamnene/Fortun. The Statnett grid queue reflects substantial demand from Hydro Aluminium's industrial expansion (162 MW consumption) and two large datacenter projects (220 MW combined) at Leirdøla, alongside multiple smaller hydropower capacity additions. With no withdrawn queue items and only one dismissed concession, the municipality shows a healthy and stable development environment.
Recent Activity
No concession changes or queue withdrawals are indicated in the last 30 days. Activity is ongoing across Hydro Energi's pumped storage and grid upgrade projects, and the two large datacenter queue reservations at Leirdøla (Gaupne Utvikling and Kitebrook) represent significant emerging demand.
Key Substations
Municipality Stance
Luster appears highly receptive to energy development, with a strong track record of granted concessions and no sign of municipal opposition. The municipality is deeply integrated into Hydro's industrial and hydropower operations, and is emerging as a datacenter destination at Gaupne/Leirdøla.
Outlook
Luster's outlook is strong. The Jamnene 420 kV transformer station upgrade significantly expands the area's grid backbone, facilitating both Hydro Aluminium's industrial load growth and new datacenter entrants. The Fortun KRA/TRA connection point is active with multiple hydropower queue reservations, suggesting continued small and medium hydro development. The Leirdøla connection point is emerging as a dedicated hub for large-scale power consumption. Developers should monitor grid capacity at both connection points as industrial and datacenter demand grows.
| — | 5.6 | production | Leirdøla (LEX) TRA | Sygnir AS | Reserved | hydro |
| FORTE VANNKRAFT AS | 24 | production | Fortun KRA/TRA | Linja AS | Reserved | hydro |
| GAUPNE UTVIKLING AS | 120 | consumption | Leirdøla (LEX) TRA | Sygnir AS | Reserved | datacenter |
| HYDRO ALUMINIUM AS | 56 | consumption | Fortun KRA/TRA | Linja AS | In Queue | industrial |
| HYDRO ALUMINIUM AS | 40 | consumption | Fortun KRA/TRA | Linja AS | In Queue | industrial |
| HYDRO ALUMINIUM AS | 40 | consumption | Fortun KRA/TRA | Linja AS | In Queue | industrial |
| HYDRO ALUMINIUM AS | 26 | consumption | Fortun KRA/TRA | Linja AS | Reserved | industrial |
| HYDRO ENERGI AS | 51 | production | Fortun KRA/TRA | Linja AS | Reserved | hydro |
| HYDRO ENERGI AS | 48 | production | Fortun KRA/TRA | Linja AS | Reserved | other |
| HYDRO ENERGI AS | 48 | consumption | Fortun KRA/TRA | Linja AS | Reserved | other |