Lærdal

Lærdal shows emerging energy activity driven by hydropower development and new datacenter interest at Borgund, with ongoing grid upgrades strengthening the local network.

Active Queue

Production

24 MW

Consumption

34 MW

Cases

4

Active Concessions

Production

7.9 MW

Consumption

0 MW

Cases

7

Overview

Lærdal municipality has a stable base of hydropower assets and active grid infrastructure investment, anchored by Statnett's 420 kV Aurland–Sogndal transmission upgrade and the 66 kV Gravdalen–Stuvane line project. The Borgund KRA/TRA substation is the focal point for grid queue activity, with Østfold Energi holding a reserved 16 MW hydro position and Småkraft queued for 8 MW. Most notably, Håbakken Næringspark has recently entered the queue twice for a combined 34 MW of datacenter consumption, signalling new demand-side interest in the municipality.

Recent Activity

In early August 2026, Håbakken Næringspark AS made two separate queue entries at Borgund KRA/TRA — one for 30 MW and one for 4 MW — both for datacenter consumption, totalling 34 MW of new demand entering the queue within two days. This represents a notable shift in the local energy profile, adding significant consumption interest to what has historically been a production-focused municipality.

Key Substations

Borgund KRA/TRABorgund transformatorstasjonSogndal transformatorstasjon

Municipality Stance

No explicit stance is documented, but the active concession portfolio and absence of rejected or withdrawn concession cases suggest a permissive regulatory environment. The arrival of datacenter interest alongside continued hydropower development indicates growing openness to new load types.

Outlook

Lærdal's outlook is cautiously positive. The Statnett 420 kV transmission upgrade will significantly strengthen regional grid capacity, potentially unlocking additional connection headroom at Borgund over time. Hydropower remains the backbone of local production with multiple active concessions and queue reservations. The emergence of datacenter demand from Håbakken Næringspark is the most significant near-term development to watch — if those 34 MW of consumption projects advance, they could catalyse further infrastructure investment and attract complementary energy projects to the municipality.

Hydropower
24
Grid Infrastructure
Data Centers
8.2productionBorgund KRA/TRASygnir ASwithdrawnhydro
HÅBAKKEN NÆRINGSPARK AS30consumptionBorgund KRA/TRASygnir ASIn Queuedatacenter
HÅBAKKEN NÆRINGSPARK AS4consumptionBorgund KRA/TRASygnir ASIn Queuedatacenter
SMÅKRAFT AS8.5productionBorgund KRA/TRASygnir ASIn Queuehydro
ØSTFOLD ENERGI AS16productionBorgund KRA/TRASygnir ASReservedhydro