Austevoll

Austevoll has limited energy project activity, with all wind power attempts historically rejected and current focus on grid reinforcement and industrial consumption.

Active Queue

Production

0 MW

Consumption

0 MW

Cases

0

Active Concessions

Production

0 MW

Consumption

21 MW

Cases

4

Overview

Austevoll's energy development history is characterized by repeated wind power rejections — three Norsk Vind projects and Statkraft's Selbjørn plant (totalling 91 MW) were all overturned by the Ministry of Petroleum and Energy after initial NVE approvals. Active cases are now confined to grid infrastructure upgrades by FAGNE (Haugaland Kraft Nett) strengthening regional connections to Tysnes and Sunnhordland, plus modest consumption from Lerøy Vest's aquaculture electrification and Aker BP's shore power project. There is no queue activity at Statnett, reinforcing the picture of a municipality with constrained renewable development prospects.

Recent Activity

A concession was granted by NVE on May 12, 2026 for the 66 (132) kV Langeland–Otteråi–Tjøreneset grid reinforcement project (FAGNE), representing the most significant recent development. No new production projects or queue entries have been registered in the municipality.

Key Substations

Otteråi transformatorstasjonLangeland transformatorstasjonMidtfjellet transformatorstasjon (Fitjar)

Municipality Stance

Austevoll has not been a facilitating environment for wind power — all four wind concession applications were ultimately rejected at the ministerial level, suggesting significant political or landscape-protection constraints. Active concessions are limited to grid upgrades and industrial consumption, implying a passive rather than proactive stance toward renewable energy production.

Outlook

Prospects for new energy production in Austevoll appear limited in the near term. The track record of ministerial wind power rejections makes new onshore wind applications unlikely, and there is no Statnett queue activity to signal developer interest. The ongoing grid reinforcement work (Langeland–Otteråi corridor) will improve regional transmission capacity and could incrementally open opportunities for consumption-side projects such as aquaculture electrification or shore power. Developers should monitor whether upgraded grid infrastructure attracts new applications, particularly for industrial or marine energy consumers.