Åseral is an established hydropower municipality with modest but active development, anchored by Å Energi's large-scale Åseralprosjektene and a reserved grid queue position at Honna.
Active Queue
Production
19 MWConsumption
0 MWCases
1Active Concessions
Production
147 MWConsumption
0 MWCases
8Overview
Åseral has a solid base of hydropower infrastructure centred around the Honna transformatorstasjon and Mandalsvassdraget, with Å Energi Vannkraft AS dominating activity across concessions and the grid queue. The municipality has seen significant wind power ambitions — notably the 400 MW Honna project (shared with Evje og Hornnes) and the 120 MW Skveneheii project — though both faced regulatory headwinds. Active concession MW is modest at ~147 MW production, reflecting a mature hydro portfolio rather than a pipeline of new large projects.
Recent Activity
No concession cases or queue items have changed status in the last 30 days based on available data. The Herresbekken kraftverk renewal application by Cadre Elvekraft and the Skveneheii concession status update to 'Gjeldende konsesjon' are the most notable recent regulatory developments worth monitoring.
Key Substations
Municipality Stance
Åseral appears open to hydropower development and has supported significant upgrades to existing facilities. Wind power has faced stronger resistance at the national regulatory level — OED rejected the Skveneheii project in 2017 on reindeer and landscape grounds — though recent status changes suggest the regulatory picture may be evolving. No clear municipal-level opposition is evident from the data.
Outlook
Åseral's energy future is primarily tied to optimising and expanding its existing hydropower assets, with Å Energi Vannkraft holding a strong position across production, grid infrastructure, and the Honna queue reservation. The surprise reinstatement of the Skveneheii wind concession could be significant if confirmed — 120 MW of wind connected to Smeland kraftstasjon would materially change the municipality's energy profile. Developers should monitor Skveneheii's status closely and note that Honna transformatorstasjon is the key connection point for any new large-scale projects in the area.
| Å ENERGI VANNKRAFT AS | 19 | production | Honna TRA | Glitre Nett AS | Reserved | hydro |