Eidskog is emerging as a notable solar development hub in Innlandet, with four ground-mounted solar projects totalling 43 MW in active concession processes.
Active Queue
Production
0 MWConsumption
0 MWCases
0Active Concessions
Production
43 MWConsumption
0 MWCases
6Overview
Four solar power plants — two by Differ Energy and two by Pyur Energy — are in various stages of concession processing around the Magnor area, collectively representing 43 MW of new production capacity. Several projects incorporate agrivoltaic designs, combining solar generation with agricultural land use. Grid capacity is being addressed proactively, with Elvia expanding Eidskog transformer station to support the anticipated load growth.
Recent Activity
Grasmo Solkraftverk (7 MW, Differ Energy) received its NVE concession on 28 May 2025, marking the first granted concession in the current wave of solar development in Eidskog. Elvia's expansion of Eidskog transformer station is also progressing through the concession process.
Key Substations
Municipality Stance
No explicit municipal stance is documented, but the volume of active concession applications — including agrivoltaic projects that combine energy production with agriculture — suggests a permissive local environment for ground-mounted solar development.
Outlook
Eidskog has a concentrated cluster of solar projects in the Magnor area with a combined 43 MW pipeline, and grid reinforcement is underway to support new connections. The absence of any queue items or withdrawn projects suggests developers are pursuing the concession route directly, and the recent grant at Grasmo sets a positive precedent. Developers should monitor available capacity at Eidskog transformatorstasjon as multiple projects compete for connection.