Træna

Træna has limited wind energy development with one expired concession for a small 6 MW project that was never built.

Active Queue

Production

0 MW

Consumption

0 MW

Cases

0

Active Concessions

Production

0 MW

Consumption

0 MW

Cases

1

Overview

The municipality has minimal energy development activity, with only one recorded wind power concession that expired in 2022 without being realized. The failed Vardøya wind project suggests challenges in executing renewable energy developments in this island municipality.

Recent Activity

No recent activity - the only recorded project expired in July 2022 after failing to meet construction deadlines.

Key Substations

Selvær

Outlook

Limited prospects given the island location and previous project failure, though the existing grid connection point at Selvær could potentially support future smaller-scale developments.

Wind Power
Aquaculture