Hjelmeland

Hjelmeland shows focused energy development with small-scale hydro and aquaculture projects alongside grid infrastructure improvements.

Active Queue

Production

0 MW

Consumption

0 MW

Cases

0

Active Concessions

Production

3 MW

Consumption

0 MW

Cases

4

Overview

The municipality has a balanced energy portfolio with 4 active concession cases totaling 3 MW of hydro production capacity and grid infrastructure developments. Recent activity includes new hydro projects and aquaculture connections, though some hydro development has faced setbacks with a 6.4 MW project withdrawal from the grid queue.

Recent Activity

Strong recent activity with new hydro and aquaculture projects filed, including a 3 MW Segadal kraftverk concession and Årdal Aqua grid connection permit. However, a 6.4 MW hydro project was withdrawn from the grid queue, and MOWI's aquaculture connection was also removed.

Key Substations

Hjelmeland transformatorstasjonFørre

Outlook

Moderate prospects focused on small-scale renewable development and aquaculture expansion, with active grid infrastructure improvements supporting local energy needs, though larger hydro development may face grid capacity constraints.

Grid Infrastructure
Hydropower
Segadal (3,7 Mw) Og Osane (2,7 Mw) Kraftverk6.4productionFørreFagne ASwithdrawnhydro