Hjelmeland
Hjelmeland shows steady hydropower development with Statkraft's major Blåfjell pumped storage project and ongoing grid infrastructure upgrades.
Active Queue
Production
0 MWConsumption
0 MWCases
0Active Concessions
Production
4.5 MWConsumption
0 MWCases
6Overview
The municipality has 6 active concession cases totaling 4.5 MW of hydropower, dominated by Statkraft's Blåfjell pumped storage expansion as part of the larger Ulla-Førre complex. Grid infrastructure activity is significant with multiple network upgrades and aquaculture connections, though one hydropower project was recently withdrawn from the grid queue.
Recent Activity
Active grid infrastructure development with Lnett upgrading transformer stations and Årdal Aqua building new network stations for aquaculture operations, alongside Statkraft's temporary construction facilities for the Blåfjell project.
Key Substations
Outlook
Moderate prospects driven by existing hydropower infrastructure and the strategic Førre connection point, with potential for aquaculture-related grid demand growth, though some project withdrawals indicate selective development.
| Segadal (3,7 Mw) Og Osane (2,7 Mw) Kraftverk | 6.4 | production | Førre | Fagne AS | withdrawn | hydro |