Stavanger Havn
Org.nr: 000000126
Stavanger Havn has secured 24 MW grid capacity for transport electrification at their port operations.
Active Queue
Production
0 MWConsumption
24 MWCases
1Active Concessions
Production
0 MWConsumption
0 MWCases
0Overview
The Port of Stavanger is taking concrete steps toward electrification by securing dedicated grid capacity for transport operations. This represents a strategic infrastructure investment to support sustainable port operations and potentially enable shore power for vessels or electric transport equipment at the port.
Active Regions
Strategic Focus
Port electrification and sustainable transport infrastructure, likely focused on shore power connections for vessels or electric transport equipment at Stavanger port facilities
Recent Activity
Recently secured a 24 MW grid reservation at Stølaheia station, marking their entry into energy infrastructure development for transport electrification (March 2026)